Viewing Monitoring Graphs

On the monitoring graphs page that is displayed, you can perform the following operations to view monitoring data:

Modifying the Displayed Monitoring Metrics

You can specify a metric in the search box.

Figure 1 Searching for a metric graph

Or you can click Configure Metric to select the metric graph to be displayed.

Figure 2 Configure Metric
Figure 3 Configuring a metric
Figure 4 Graph of the configured metric

Selecting the Monitoring Period

On the monitoring graphs page that is displayed, the metric graphs of the last one hour is displayed by default (Figure 5). You can configure the period to the last three hours or last 12 hours.

Figure 5 Metric graphs of the last 12 hours

Refreshing the Monitoring Data

You can enable the automatic refresh function or manually click the refresh button to refresh the monitoring data so that you can obtain the latest monitoring graphs.

Figure 6 Refreshing the monitoring data

Displaying the Detailed Data of a Metric at a Specific Time

When you move the cursor to a time point on curve of a monitoring graph, the detailed data of the time point is displayed.

Figure 7 Displaying the detailed data of a metric at a specific time